The time required for elevator installation depends on several factors, including the type of elevator, building structure, and complexity of the project.

For a standard passenger elevator in a new building, the process can take anywhere from 4 to 8 weeks, including site preparation, installation, and testing.

In existing buildings, where modifications are needed, installation can take 8 to 12 weeks due to additional construction work, such as creating an elevator shaft.

Specialized elevators, such as freight or high-speed elevators, may require 3 to 6 months due to their intricate engineering requirements.

Custom elevators, including luxury or home elevators, may take longer depending on the level of customization required.